Yn dangos sylwadau a ffurflenni 1 i 2 o 2

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5221

Derbyniwyd: 12/04/2023

Respondent ID: 4967

Ymatebydd: Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

In summary, we object to the inclusion of the allocation in question on the basis that its inclusion within the Plan would result in the document being ‘unsound’.
We therefore respectfully request that this Representation be given careful examination, and that the allocation be removed to ensure that the document passes all the relevant tests of soundness


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.

Gwrthwynebu

Ail Gynllun Datblygu Lleol Adneuo Diwygiedig Sir Gaerfyrddin

ID sylw: 5278

Derbyniwyd: 12/04/2023

Respondent ID: 4075

Ymatebydd: Mrs D Davies

Asiant : Evans Banks Planning Limited

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

Objection to the inclusion of SeC6/h2

Part of the site has the benefit of planning permission for 8 detached houses, of which only two have been constructed. No planning permission has ever been sought for the majority of the site

Consequently, twenty-five years of Development Plan allocations have elapsed without any signs of wholesale delivery of this site, apart from two units. Clearly, there is no historic demand for a site of this scale in this part of the Hendy area.

It is also a physically challenging site, due to steep topography and the inability to adequately dispose of surface water.

The allocation fails the test of soundness as the site is clearly unable to deliver any new housing.


Ein hymateb:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.