SR/086/028
Gwrthwynebu
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
ID sylw: 2414
Derbyniwyd: 06/02/2019
Ymatebydd: Mrs Anne Mathias
The respondent sets out a range of concerns in relation to the proposed candidate site(s). The concerns listed include transport / traffic - including capacity concerns towards the M4 junction, along with concerns at capacity of local education and health provision. There is also reference to concerns with regards to problems with water drainage.
Gwrthwynebu
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
ID sylw: 2612
Derbyniwyd: 07/02/2019
Ymatebydd: Paul & Carol Harries
Infrastructure currently cannot cope.
Local Transport facilities are insufficient.
Sewerage system currently cannot cope with demand.
Water table/runoff is at over capacity.
Highways/ Road impractical.
Gwrthwynebu
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
ID sylw: 2640
Derbyniwyd: 07/02/2019
Ymatebydd: Mr Roger Fidler
I object to the proposals for the following reasons: -
1. To join Bryn and Llangennech is unacceptable, a green belt buffer is required
2. Ribbon development on this side of Penllwyngwyn Road is bad planning
3. Sites SR/086/038 and SR/086/028 are good quality agricultural land
4. Bryn is not a growth pole only development land for local need should be zoned.
Sylw
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
ID sylw: 2669
Derbyniwyd: 07/02/2019
Ymatebydd: Terry & Margaret Jones
1. Will the existing Health Care services be sufficient to cope with the extra patients?
2. What will be the availability of suitable school places in the area of Bryn/Bynea/ Llangennech, taking into account that Llangennech school is Welsh only!
3. We have concerns regarding the road network. At peak times there is considerable traffic through Bridge Street Llangennech.
Gwrthwynebu
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
ID sylw: 2724
Derbyniwyd: 07/02/2019
Ymatebydd: Mrs Joanne Williams
1. Impact upon rural character of Llangennech.
2. Building on this land would connect Llangennech to Bryn, taking away the boundary between the two.
3. Aesthetic importance - building on this land would take away the view of our rural scenery.