SR/163/001
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 124
Received: 24/01/2019
Respondent: Sharon Slattery-Godwin
I object to more development in this area as we are already experiencing sewage and surface water flooding due to inadequate sewage and surface water drainage. This situation needs to be addressed before any furthur strain is put on the system, residentail or business.
Comment
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 1321
Received: 08/02/2019
Respondent: Whitland Town Council
Concerns about flooding and water ingress for existing and any new properties in this area should be addressed before any development is allowed.
Comment
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 2930
Received: 08/02/2019
Respondent: Cllr Sue Allen
Site at North road adjacent and North to Llys y Brennin. SR/163/001
There is existing traffic calming at the potential access to this site and the main concern is the lack of capacity for surface water off flow. Currently the site discharges into a ditch on private park land owned in trust for the residents. During rainfall this ditch floods over the pathway and into the base of gardens of at Llys y Brennin but mainly into the garage of the property on North road. The discharge from the candidate site is a major inflow and causes the water to rise so rapidly. Water would need to be diverted towards the Afon Gronw to the East to ensure flooding of the property on the corner and garden flooding be alleviated. Alternatively a significant on site drainage scheme is needed. I am advised the garage has been recently raised to protect it from some incidents.
No comments received from residents on the other sites.