SR/132/007

Showing comments and forms 1 to 1 of 1

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 296

Received: 31/01/2019

Respondent: Mr Daniel Smitham

Representation Summary:

Access

The current inferstructure on Waterloo road cant handle anymore houses being built. The increase of traffic along with the congestion with the local school 300 yards away is going to cause problems for residents and children.

Roads and street lighting
The current waste water drainage on the roads is continuously blocked due to debris on the roads from housing developers.
The roads, street light and walkways aren't sufficient enough for which will become a busy road for residents and school children

Habitat
Local wildlife in the area is being forced out and our village.