Support
Second Deposit LDP
Representation ID: 4939
Received: 14/04/2023
Respondent ID: 5543
Respondent: Maes Ifan Developments
Agent: Mr T Mabbitt
Support for the continued inclusion of allocation PrC3/h6. Supporting documents are submitted.
No change to the Plan.
Please see the attached:
Representation Form
Supporting Statement
Historic Submissions & Planning History
Support welcomed.
Object
Second Deposit LDP
Representation ID: 5368
Received: 14/04/2023
Respondent ID: 3968
Respondent: Mr I Jones
Agent: JCR Planning Ltd
Legally compliant? Not specified
Sound? No
This representation comprises an objection to the inclusion of PrC3/h6 as a formal allocation for residential development within the development limits for Betws/Ammanford.
The objection is primarily based on -
1. The viability of the site - there is little evidence to suggest that it will come forward during the plan period.
2. The inadequacy of the highway network in the vicinity of this site - it is a common occurrence for significant levels of vehicle congestion to occur at this location.
3. There are amenity issues associated with the proposed development.
The continued inclusion of PrC3/h6 is blocking and preventing the development of other more appropriate residential schemes in this part of Betws/Ammanford.
Remove the site from the Plan
This representation comprises an objection to the inclusion of PrC3/h36 and
PrC3/h6 as formal allocations for residential development within the
development limits for Betws/Ammanford.
The objection is primarily based on -
1. The viability of these two sites - there is little evidence to suggest that they
will come forward during the plan period.
2. The inadequacy of the highway network in the vicinity of these sites - it is a
common occurrence for significant levels of vehicle congestion to occur at
these locations.
3. There are amenity issues associated with their proposed development.
The continued inclusion of PrC3/h36 and PrC3/h6 is blocking and preventing
the development of other more appropriate residential schemes in this part of Betws/Ammanford.
Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.