Showing comments and forms 1 to 1 of 1

Object

Second Deposit LDP

Representation ID: 5482

Received: 11/04/2023

Respondent ID: 5802

Respondent: Dale Bowler

Agent: Asbri Planning Ltd

Legally compliant? Not specified

Sound? Yes

Representation Summary:

Object to Policy HOM1 (Housing Allocation) – the Clos Y Parc site has already been built out. Within the deposit plan, the site is allocated for 16 dwellings, all of which have been delivered. Secondly, the site originally formed part of a larger housing allocation in the current adopted LDP which aspired to achieve 34 dwellings but in reality only delivered 25, resulting in a shortfall of 9 dwellings. One way of making up for this shortfall is to permit residential development in other areas of the settlement, and the proposed site at Horeb will positively contribute in this respect.

Change suggested by respondent:

Amend Plan to include new site highlighted in another representation

Full text:

Please see Supporting Statement - The Clos Y Parc site (SuV23/h1) has already been built out. Within the deposit plan, the site is allocated for 16 dwellings, all of which have been delivered. Secondly, this allocation formed part of a larger allocated site in the current Adopted LDP which aspired to achieve 34 dwellings but only 25 were delivered, resulting in a shortfall of 9 dwellings. This shortfall could be compensated for by the inclusion of the site proposed at Horeb within extended development limits.


Our response:

Disagree, the allocation of the site within the LDP for residential purposes has been subject to full consideration through the site assessment methodology. As part of this assessment process a detailed site pro forma has been prepared.