SR/086/011

Showing comments and forms 1 to 14 of 14

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 371

Received: 02/02/2019

Respondent: Martin Unwin

Representation Summary:

In the local area the roads are already congested, with the development of more housing road congestion will increase, leading to health issues and possible accidents.
There are no more available school places
Demand for medical services, including a doctor is high now and with additional homes being developed demand will increase.
The area is over developed now, there are few employment opportunities for the local area.
Local services, such as sewerage are stretched now. More housing will place even more pressure on services.
There is a potential for environmental damage which could affect local wildlife.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 462

Received: 03/02/2019

Respondent: mrs serah thomas

Representation Summary:

if you were to build on this land, it would have disastarous consequences for wildlife which has already relocated in recent years due to the area being built upon, such as bryn uchaf and the currenct site ( persimmon site) Sighting of bats in this area. this land has salways been green!
There is also insufficient infrastructure, our roads are max to capacity and also sewege! the system can't cope with any more homes!!!
The road network would not be able to cope with any extra traffic.
insufficient school places, lack of healthcare

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 468

Received: 03/02/2019

Respondent: Mr allan thomas

Representation Summary:

There should be no more residential development in the Bryn area. The infrastructure is insufficient, healthcare support such as doctors surgeries are lacking, local schools are already at maximum capacity and people are having to travel out of the area for schools, there is already inadequate drainage in the lower village and flooding is frequent, the road network is already straining Especially the M4 junction, Wildlife and their habitat is constantly being displaced such as protected bat species.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 558

Received: 04/02/2019

Respondent: Miss Leah Stevens

Representation Summary:

There are a lot of new builds

Schools are overcrowded- making it impossible for your child to get a school place

Inadequate drainage/sewerage issues

Road network unable to cope with extra traffic

Disastrous consequences to wildlife

GP Surgeries full to capacity- lack of healthcare

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 745

Received: 05/02/2019

Respondent: Mr Joel Brown

Representation Summary:

PLEASE THINK BEFORE DOING MORE HOUSING IN THESE AREAS

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 908

Received: 06/02/2019

Respondent: Mrs Rita Morgan

Representation Summary:

The roads in the area are not able to support an increase in traffic, the same applies to our schools, Doctor's surgeries and drainage systems.
Also the environmental consequences; the destruction of beautiful green space and damage to wildlife. There are brown/derelict sites in the County which need improving and could be used. The health implications on residents of increased traffic through our villages. I feel the need for extra housing is not in our area but in other parts of the Country, many houses are taking so long to be sold, this does not reflect a housing shortage here.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1090

Received: 07/02/2019

Respondent: Miss Monika Menkhaus

Representation Summary:


Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1169

Received: 07/02/2019

Respondent: Miss Sarah Harries

Representation Summary:

Insufficient/Inadequate Infrastructure
Lack of Healthcare i.e. places in Doctors Surgeries
Insufficient/Inadequate School Places (current residents finding it impossible to find nursery/school spaces)
Inadequate drainage/sewerage issues
Road network unable to copy with extra traffic (Llangennech already incredibly congested at all times of the day.)
Disastrous consequences to wildlife (already dispossessed of multiple sites as a result of large new builds on farmland).
We currently have numerous large builds going on - creaking infrastructure will not survive further new builds.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1247

Received: 07/02/2019

Respondent: Miss Rhiannon Fraser

Representation Summary:

In summary, I strongly object to this planning request as it wil have a significant impact on congestion/parking, being able to obtain timely healthcare, a detrimental effect on the local wildlife, a sewerage & surface water drainage network that won't be able to cope with the extra demand & being able to get school places for children within the villages.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1574

Received: 08/02/2019

Respondent: Mrs Sheila Richards

Representation Summary:

Insufficient/inadequate infrastructure
Nursery and schools are already oversubscribed with local people failing to find places for their children.
Inadequate drainage/sewerage issues
Road network unable to cope with extra traffic
Disastrous consequences to wildlife (already dispossessed of multiple sites as a result of large new builds on farmland).
We currently have numerous large builds going on in Bynea & Bryn - infrastructure will not survive further new builds.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2066

Received: 06/02/2019

Respondent: Mr Ian Gwynne Wooldridge

Representation Summary:

This proposed development is in close proximity to the local primary school and a further increase in traffic just before school opens and closes will create further congestion on the entrance to and out of the school. Greatly increasing the possibility of a serious accident. Roads leading up to the school are inadequate to deal with the increased traffic.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2290

Received: 08/02/2019

Respondent: Mr & Mrs R J & E Keatley

Representation Summary:

1. Against residential development as in No. 1 on the (attached document)
2. Road network unable to cope with increased traffic
3. Disastrous/irrevocable consequences to wildlife
4. Inadequate drainage/sewerage
5. Difficulty getting GP/healthcare appointments
6. Insufficient/inadequate school places

We believe the level of residential development in the area is seriously getting out of control to the detriment of the local communities, current & future & needs to be carefully controlled.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2324

Received: 08/02/2019

Respondent: Mrs Caryl Phillips

Representation Summary:

The previous and continuing overdevelopment of Bynea has overwhelmed the existing infrastructure such as sewerage, traffic congestion, local education and health services. Development included on the previous LDP are as yet far from complete.

Once complete these will obviously further exacerbate the lack of facilities to cope with the number and type of additional developments proposed on the candidate site list.

Maintenance of open space and the creation of much needed leisure facilities for the area would be most welcome.

Retain as agriculture / open space

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2818

Received: 08/02/2019

Respondent: Tanya Greene

Representation Summary:

Insufficient, infrastructure
Lack of Healthcare
Lack of school places
Sewerage issues
Extra traffic
Issues with wildlife - losing local habitats