SR/069/004

Showing comments and forms 1 to 29 of 29

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 60

Received: 17/01/2019

Respondent: Mr deian Hopkin

Representation Summary:

The proposed site is outside the limits of Fforest and represent further ribbon development not in line with Planning Policy Wales Guidance extending the village limits further into the green space

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 161

Received: 25/01/2019

Respondent: Mr Ninad Thackare

Representation Summary:

These developments will negatively affect civic amenities.
Specifically, our water pressure is quite low at present. With residential development this will be further reduced.
An increase in traffic will lead to jams and delays.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 166

Received: 25/01/2019

Respondent: Mr Michael Davies

Representation Summary:

I live at 28 FForest Road have done for some 25years. In that time I have witnessed a large increase in traffic flow down to the Black Horse, as well as the traffic from Hendy and Pontardulais
At 7 30am up until 9am the traffic with its inherenttraffic pollution has prompted me to vary my walking time ,similarly in the evening..I have also concidered wearing a face mask akin to Peking residents.Where are the plans for upgrading the roads, Surgeries, Schools Sewers,Land drainage,access etc.With all the other application at present, I fear for our well being.
Carbon free no chance.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 168

Received: 25/01/2019

Respondent: Mr Michael Davies

Representation Summary:

I live at 28 FForest Road have done for some 25years. In that time I have witnessed a large increase in traffic flow down to the Black Horse, as well as the traffic from Hendy and Pontardulais
At 7 30am up until 9am the traffic with its inherenttraffic pollution has prompted me to vary my walking time ,similarly in the evening..I have also concidered wearing a face mask akin to Peking residents.Where are the plans for upgrading the roads, Surgeries, Schools Sewers,Land drainage,access etc.With all the other application at present, I fear for our well being.
Carbon free no chance.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 193

Received: 26/01/2019

Respondent: Mrs KARYL MATTHEWS

Representation Summary:

Wildlife habitat is very strong in this long unfarmed patch of land .Animals and plants do not add to environmental issues , building properties will .
Road networks stretched to grid-lock now , Pontarddulais,Hendy and Fforest Hill can not cope now and pressure would be even further increased by car numbers coming from adding more properties.
Doctors surgery can't cope with patient numbers now , why add more potential residents .
Sewerage , how will it cope .

Kind regards,
Mrs K Matthews

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 196

Received: 27/01/2019

Respondent: Mr David Clive MATTHEWS

Representation Summary:

Natural wildlife habitat is very strong in this unfarmed area of land. Animals and plants do not add to environmental issues , building properties will.
Road networks stretched to grid lock already. Pontarddulais,Hendy and Fforest Hill can't cope now and pressure would be even further added with increased traffic coming from even further development.
Doctors surgery can't cope with patient numbers now, why add more potential residents .

Sewerage , how will it cope .

Many thanks,

Mr D C Matthews

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 197

Received: 27/01/2019

Respondent: MR KEIRAN JAMES MATTHEWS

Representation Summary:

Wildlife habitat is very strong in this long unfarmed patch of land
.Animals and plants do not add to environmental issues , building
properties will .
Road networks stretched to grid-lock now , Pontarddulais,Hendy and
Fforest Hill can not cope now and pressure would be even further increased
by car numbers coming from adding more properties.
Doctors surgery can't cope with patient numbers now , why add more
potential residents .
Sewerage , how will it cope .

Kind regards,
Mr KJ Matthews

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 423

Received: 03/02/2019

Respondent: Mr Alan Austin

Representation Summary:

I am objecting to the Land Development Plan SR/069/003 for a number of crucial reasons.
There appears to be no resources allocated to ensure that the extra pressure on roads, school capacity, surgery places or building on land that already has been designated as prone to flooding has been addressed.
The two roads which will have to cope with the massive increase in traffic are totally inadequate, one a single track (3.01m wide) up Bronallt Road and the A48 is also effectively single lane, due to cars parking on both sides of the road.
No consideration for residents.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 426

Received: 03/02/2019

Respondent: Mr Alan Austin

Representation Summary:

I am objecting to the Land Development Plan SR/069/004 for a number of crucial reasons.
There appears to be no resources allocated to ensure that the extra pressure on roads, school capacity, surgery places or building on land that already has been designated as prone to flooding has been addressed.
The two roads which will have to cope with the massive increase in traffic are totally inadequate, one a single track (3.01m wide) up Bronallt Road and the A48 is also effectively single lane, due to cars parking on both sides of the road.
No consideration for residents.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 484

Received: 04/02/2019

Respondent: Mr Mike Pugh

Representation Summary:

Summary
These candidate sites do not comply with the following
Strategic Policy - SP 19: Waste Management
Strategic Policy - SP 8: Infrastructure
Strategic Policy - SP 17: Transport and Accessibility
Strategic Policy - SP 15: Climate Change
increased pressure on the River Loughor as per TAN 15 quoted below.
Strategic Policy - SP 11: Placemaking, Sustainability and High Quality Design.
* Development in these areas would be in an SLA ,special landscape Area,and as such does not sit well in the existing,natural and local Character of the area and does not enhance biodiversity .

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 502

Received: 04/02/2019

Respondent: Mrs Hilary Pugh

Representation Summary:

based on the following strategic policies
Strategic Policy - SP 6: Employment and the Economy
Strategic Policy - SP 8: Infrastructure
Development will need to be directed to locations where the infrastructure, services and facilities considered necessary to deliver and support the development proposal are available. current Infrastructure at these sites is not available or sustainable
- SP 12: Rural development
As per SP 13 this development would not enhance this SLA , and would certainly have an adverse effect on the biodiversity of the river . This objection would also apply to SP14 especially regarding landscape and conservation areas

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 595

Received: 04/02/2019

Respondent: MR Michael Clement

Representation Summary:

Further development in the Pontardulais/Hendy/Fforest area will have a significant effect on the infrastructure, services (surgey, school, etc.) and road access to J48 of the M4. Hendy primary school has not increased in size since I attended nearly 50 years ago. It is already diffiult to get appointments at Pontardulais surgery and traffic is already conjested at J48 of the M4 with poor layout at this junction causing tailbacks joining the M4 from either Hendy or Llanelli. Tailbacks already stretch back onto the motorway on exiting the M4 from the east during evening rush hour..

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 865

Received: 06/02/2019

Respondent: Mr Paul Coleman

Representation Summary:

I have two main areas of comment:
Infrastructure and Traffic.
Any future development in this area MUST be accompanied by a proportional increase in school places and doctors surgery places. sewerage and water supply.
Bronallt Road is already being used as a short cut between the motorway at J48 and Fforest, Llanedi and Tycroes. This road already carries far too much traffic, often speeding - it was not intended to be used as a major thoroughfare or trunk road. The junction of Bronallt, Carmarthen and Fforest Roads is already dangerous - increased traffic can only make it worse.
Plan responsibly!

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 968

Received: 06/02/2019

Respondent: Aled Francis

Representation Summary:

I object for the following reasons:
1. over development of area
2. it would turn area into a commuter conurbation
3. detrimental impact on Welsh language
4. detrimental and irreversible impact on nature and ethos of the community
5. detrimental impact on Special Landscape Area
6. unsuitable land due to flooding and hidden springs - over development would not allow water to run down to the river
7. inadequate infrastructure to cope with more development - situation has reached saturation point already
8. greenfield site needs to be protected as agricultural land for Future Generations

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 977

Received: 06/02/2019

Respondent: Dr Non Evans

Representation Summary:

Yr wyf yn gwrthwynebu ar sail y rhesymau canlynol:
1. Gor-ddatblygu'r ardal
2. Colli hunaniaeth y pentref oherwydd gor-ddatblygu dros gyfnod byr.
3. Effaith andwyol ar yr iaith Gymraeg
4. Effaith andwyol ar Ardal Tirwedd Arbennig (SLA)
5. Tir anaddas - Byddai'r cynlluniau'n cynyddu posibilrwydd llifogydd - yn groes i SP15.
6. Isadeiledd annigonol i ymdopi â mwy o ddatblygiad
7. Trafnidiaeth - tagfeydd a phroblemau trafnidiaeth yn gyson yn ardal Hendy/ Fforest
8. Mae angen gwarchod safle tir glas fel tir amaethyddol ar gyfer Cenedlaethau'r Dyfodol.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 988

Received: 07/02/2019

Respondent: Aled Francis

Representation Summary:

Yr wyf yn gwrthwynebu ar sail y rhesymau canlynol:
1. Gor-ddatblygu'r ardal
2. Colli hunaniaeth y pentref oherwydd gor-ddatblygu dros gyfnod byr.
3. Effaith andwyol ar yr iaith Gymraeg - mae angen amddiffyn cymunedau gyda chanran uchel o siaradwyr Cymraeg rhag gor-ddatblygu a Seisnigo.
Tir anaddas - problemau draeniad
6. Isadeiledd annigonol i ymdopi â mwy o ddatblygiad
7. Trafnidiaeth - tagfeydd /peryglon mynedfa ar groesffordd Sgwar y Fforest / llygredd.
8. Mae angen gwarchod safle tir glas ar gyfer Cenedlaethau'r Dyfodol.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1065

Received: 07/02/2019

Respondent: Mr Ross Houston

Representation Summary:

wish to protect the greenfield site for future generations. The reason being that is a special land scape area. In addition any development on this land would contravene EQ6, TAN 15, SP12, SP13, SP15, SP17 and PPW para 9.2.2. Developing the land would also go against the wellbeing Act.

I live 2 door down from forest garage and I see a lot of wild life in this area fox's birds and more it would be devastating to see their home destroyed

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1109

Received: 07/02/2019

Respondent: Mr Philip Davies

Representation Summary:

This site is an established woodland with a very mature roadside hedgeline

The site is home to mature trees which should be protected, and an abundance of wildlife including foxes, and Red Kites can regularly be seen flying amongst the trees

Removing this natural woodland and habitat would be a dteremental effect on the environment of the area

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1274

Received: 07/02/2019

Respondent: Andrew Chalkley

Representation Summary:

I wish to protect the greenfield site for future generations. The reason
being that it is a Special Landscape Area. In addition any development on
this land would contravene EQ6, TAN15, SP12,SP13, SP15, SP17 and PPW para
9.1.2. Developing the land would also go against the Wellbeing Act.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1368

Received: 08/02/2019

Respondent: Llanedi Community Council

Representation Summary:

Following public consultation, a meeting of Llanedi Community Council on the 6th February 2018 agreed that we wish to object to all future large scale (5 plus houses) proposals for residential development in Hendy and Forest. Significant development has already taken place in recent years in the area. We are also concerned about the impact of future developments in Pontarddulais on our community.
Our specific objection to this candidate site also includes concerns over:
* inadequate access
* increased traffic
* its environmental importance (SLA);
* drainage/flooding;
* pressure on infrastructure (Dr's/schools etc)
* Ribbon development

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1501

Received: 08/02/2019

Respondent: Mr Spencer Green

Representation Summary:

I wish to protect the greenfield site for future generations as it is a Special Landscape Area. Any development on this land would contravene EQ6, TAN15, SP12, SP13, SP15, SP17 and PPW para 9.1.2, and would also go against he Wellbeing Act. Also, Fforest cannot cope with any more development due to lack of infrastructure, increasing road and motorway congestion, increasing pollution, and the detrimental effect on existing property prices that would occur on houses near these green areas. There are also rare birds of prey and wildlife habitats which must not be disturbed. Please respect our beautiful village.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1520

Received: 08/02/2019

Respondent: Mr Garry Mills

Representation Summary:

I wish to protect the greenfield site for future generations as it is a Special Landscape Area. Any development on this land would contravene EQ6, TAN15, SP12, SP13, SP15, SP17 and PPW para 9.1.2, and would also go against he Wellbeing Act. Also, Fforest cannot cope with any more development due to lack of infrastructure, increasing road and motorway congestion, increasing pollution, and the detrimental effect on existing property prices that would occur on houses near these green areas. There are also rare birds of prey and wildlife habitats which must not be disturbed. Please respect our beautiful village.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1951

Received: 04/02/2019

Respondent: NG Fraser-Pearson

Representation Summary:

The respondent objects to the above site for the following reasons:

- over develops Fforest Village
- increased load on drainage & utility services;
- extra demand on Doctors etc & School;
- increased traffic through Fforest/Hendy & at J38 M4;
- delete site from LDP.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2047

Received: 06/02/2019

Respondent: Phillip Davies

Representation Summary:

The respondent states that this would extend the settlement to the north of Fforest considerably along Llanedi Road and exacerbate the ribbon development that Planning Policy Wales says should be avoided. The respondent adds that it should be noted that on this site there are springs and vegetation, including osiers, that are associated with wet land; so there are concerns about drainage problems arising for the wider area if the land is built upon.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2052

Received: 05/02/2019

Respondent: Mrs E M Lewis

Representation Summary:

As this land is privately owned and the ownership has been unresolved for many years it is of concern as to who has applied for planning permission. Also this area is "Green Belt" and agricultural land so changes the whole concept of rural area.

The road is certainly not suitable for increased traffic, recently animals from a local farm have been causing problems straying onto the road and have been reported to the police.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2716

Received: 08/02/2019

Respondent: Mr & Mrs J Daniels

Representation Summary:

I strongly object to this area even being considered for development and green field sites should be retained at all cost.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2795

Received: 08/02/2019

Respondent: miss louise short

Representation Summary:

I would like to express my concern and object to the proposals in the above areas please. I believe the closing date is today.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2979

Received: 11/02/2019

Respondent: Mrs Jennifer Downes

Representation Summary:

Hoffwn fynegu fy ngwrthwynebiad i'r holl ddatblygiadau yn ardal Heol Fforest, Heol Bronallt, Heol Caerfyrddin, Plas y Fforest a Heol Llanedi. Byddai'r datblygiadau hyn ar dir gwyrdd a ddylai gael ei warchod er lles y boblogaeth presennol yn ogystal a'r dyfodol.

Byddai unrhyw ddatblygiad ar y tir yn gwrthfynd a EQ6, TAN15, SP12, SP13, SP15, SP17 a PPW par9.1.2.
Dylai'r Sir hefyd ystyried bwriad ac ysbryd y Ddeddf Llesiant.

I would like to express my objection to all of the developments in Heol Fforest, Heol Bronallt, Heol Caerfyrddin, Plas y Fforest and Heol Llanedi. These developments would be built on green land which should be protected for the current and future population's welfare.

Any development on the land would go against EQ6, TAN15, SP12, SP13, SP15, SP17 and PPW par9.1.2.
The County should also consider the intention and spirit of the Well-being Act.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2987

Received: 05/02/2019

Respondent: Mr & Mrs E Jones

Representation Summary:

* Rydym yn parhau i wrthwynebu cynnwys unrhyw ddatblygiadau cynllunio pellach yn ardaloedd Yr Hendy a'r Fforest o fewn y Cynllun Datblygu Lleol ar gyfer 2018-2033, a hynny oherwydd yr adeiladu sylweddol a fu dros y blynyddoedd diwethaf.
* Rydym o'r farn hefyd y dylid dileu'r ardaloedd i'w datblygu a glustnodwyd yn y CDLl blaenorol, yng nghyd-destun Yr Hendy a'r Fforest.

* We continue to object that any further planning developments in the Hendy and Fforest area be included in the Local Development Plan for 2018-2033, due to the significant construction work in recent years.
* We also believe that the areas identified for development in the previous LDP should be removed, within the Hendy and Fforest area.