SR/086/017
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 472
Received: 03/02/2019
Respondent: Mr allan thomas
There should be no more residential development in the Bryn area. The infrastructure is insufficient, healthcare support such as doctors surgeries are lacking, local schools are already at maximum capacity and people are having to travel out of the area for schools, there is already inadequate drainage in the lower village and flooding is frequent, the road network is already straining Especially the M4 junction, Wildlife and their habitat is constantly being displaced such as protected bat species.
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 561
Received: 04/02/2019
Respondent: Miss Leah Stevens
There are a lot of new builds
Schools are overcrowded- making it impossible for your child to get a school place
Inadequate drainage/sewerage issues
Road network unable to cope with extra traffic
Disastrous consequences to wildlife
GP Surgeries full to capacity- lack of healthcare
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 798
Received: 06/02/2019
Respondent: Mrs Delyth Williams
have concerns regarding the following - the infrastructure for the area is both inadequate and insufficient for the expected population increase should these developments go ahead.
Schools in the area are already close to full capacity for existing residents.
Concerns regarding inadequate drainage and specifically sewerage issues need clarification and comprehensive investigation.
Healthcare, doctors surgeries have limited registration places available.
Road network is not suitable for this volume of traffic, the road from Bryn to Bynea will turn into a main thoroughfare.
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 799
Received: 06/02/2019
Respondent: Mr David Williams
Insufficient/Inadequate infrastructure
Insufficient school places
Inadequate drainage/sewerage issues
Road network unable to cope with extra traffic, station road Bynea virtually a single track road with parking issues
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 803
Received: 06/02/2019
Respondent: Mrs Delyth Williams
I have concerns regarding the following - the infrastructure for the area is both inadequate and insufficient for the expected population increase should these developments go ahead.
Schools in the area are already close to full capacity for existing residents.
Concerns regarding inadequate drainage and specifically sewerage issues need clarification and comprehensive investigation.
Healthcare, doctors surgeries have limited registration places available.
Road network is not suitable for this volume of traffic.
Also concerned that all the plans on-line do not show developments in the process of construction, the large Persimmon site not shown.
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 2328
Received: 08/02/2019
Respondent: Mrs Caryl Phillips
The previous and continuing overdevelopment of Bynea has overwhelmed the existing infrastructure such as sewerage, traffic congestion, local education and health services. Development included on the previous LDP are as yet far from complete.
Once complete these will obviously further exacerbate the lack of facilities to cope with the number and type of additional developments proposed on the candidate site list.
Maintenance of open space and the creation of much needed leisure facilities for the area would be most welcome.
For leisure and recreational purposes only
Object
Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions
Representation ID: 2997
Received: 07/02/2019
Respondent: Cllr Gwyneth Thomas
Fel y Cynghorydd Sir ar ran Ward Llangennech rwy'n credu'n gryf bod pentref Llangennech, gan ei fod yn agos at Gyffordd 48 o draffordd yr M4, wedi cael ei or - ddatblygu dros y blynyddoedd diwethaf. Mae yr holl dai sydd wedi cael eu hadeiladu wedi achosi problemau traffig mawr ar hyd y B4297 trwy'r pentref ac yn enwedig ar hyd yr A4138 wrth i 'r holl gerbydau geisio cyrraedd yr M4.
Ni ddylid ganiatau rhagor o dai heb gymryd ystyriaeth llawn o sut mae hyn yn mynd i effeithio'r traffig ar hyd yr heolydd yma.
As the County Councillor on behalf of Llangennech Ward, I strongly believe that the village of Llangennech, as it is near to Junction 48 from the M4 motorway, has been over developed over the last few years. All of the houses that have been built have caused significant traffic problems along the B4297 through the village and especially along the A4138 as all of the vehicles attempt to reach the M4.
No more houses should be permitted without giving full consideration to how this will affect the traffic along these roads.