SR/013/001

Showing comments and forms 1 to 6 of 6

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 1905

Received: 01/02/2019

Respondent: Maralyn Treharne

Representation Summary:

The candidate site does not comply with LDP policy.
Also, development would not comply with Planning Policy Wales (Edition 10 December 2018 SLAs conservation policy 6.3.11).

Comment

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2019

Received: 08/02/2019

Respondent: Welsh Government

Representation Summary:

Requires TS.

The respondent has compiled some general comments from Welsh Government Network Management Division as highway authority for the trunk road and motorways in Wales and also makes a number of site specific comments. The respondent states that the strategic trunk road network is for the safe and expeditious movement of long distance traffic. In order to maintain free-flow and safety, there is a general presumption against new access onto trunk roads. Further detailed advice is given on how developments should seek to access trunk roads, with reference made to guidance and legislation (including the Design Manual for Roads and Bridges (DMRB) and the Active Travel Act).

In order for the trunk road highway authority to be in a position to make a considered view, the onus is on the forward planning authority to provide highway evidence in both capacity and safety terms. This will scope the consideration of existing network capacity constraints, agreed infrastructure upgrades and outline delivery streams (such as planning obligations).

Advice is provided on the potential accompanying evidence required with an application (eg Transport Statement (TS) or Transport Assessment (TA)) - commensurate with the scale of the proposal. Applications are judged on their individual merits and specific supporting traffic impact detail may be requested in order to consider network impacts. Where designs are not DMRB compliant there is a right to issue a direction to refuse an application.

Where developments require improvements to existing or new connections to the trunk road and these are agreed at planning, the developer will be required to enter into an appropriate legal agreement for their delivery, generally via Section 184 and Section 278 of the Highways Act.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2119

Received: 23/01/2019

Respondent: Mr Gary Davies

Representation Summary:

The candidate site lack compliance with a number of current LDP requirements.

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2120

Received: 21/01/2019

Respondent: Mr & Mrs Grove

Representation Summary:

The candidate site lacks compliance with a number of current LDP requirements

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2122

Received: 21/01/2019

Respondent: Robert Lashley

Representation Summary:

The candidate site lacks compliance with a number of current LDP requirements

Object

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

Representation ID: 2123

Received: 21/01/2019

Respondent: Mr & Mrs B James

Representation Summary:

The candidate site lack compliance with a number of current LDP requirements.