SR/086/067

Yn dangos sylwadau a ffurflenni 1 i 8 o 8

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 449

Derbyniwyd: 03/02/2019

Ymatebydd: mrs serah thomas

Crynodeb o'r Gynrychiolaeth:

if you were to build on this land, it would have disastarous consequences for wildlife which has already relocated in recent years due to the area being built upon, such as bryn uchaf and the currenct site ( persimmon site) Sighting of bats in this area. this land has salways been green!
There is also insufficient infrastructure, our roads are max to capacity and also sewege! the system can't cope with any more homes!!!
The road network would not be able to cope with any extra traffic.
insufficient school places, lack of healthcare

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 476

Derbyniwyd: 03/02/2019

Ymatebydd: Mr allan thomas

Crynodeb o'r Gynrychiolaeth:

There should be no more residential development in the Bryn area. The infrastructure is insufficient, healthcare support such as doctors surgeries are lacking, local schools are already at maximum capacity and people are having to travel out of the area for schools, there is already inadequate drainage in the lower village and flooding is frequent, the road network is already straining Especially the M4 junction, Wildlife and their habitat is constantly being displaced such as protected bat species.

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 563

Derbyniwyd: 04/02/2019

Ymatebydd: Miss Leah Stevens

Crynodeb o'r Gynrychiolaeth:

There are a lot of new builds

Schools are overcrowded- making it impossible for your child to get a school place

Inadequate drainage/sewerage issues

Road network unable to cope with extra traffic

Disastrous consequences to wildlife

GP Surgeries full to capacity- lack of healthcare

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 628

Derbyniwyd: 05/02/2019

Ymatebydd: Mr Jonathan Harries

Crynodeb o'r Gynrychiolaeth:

Far to many new build homes being built in this area. Schools are overcrowded - makes it impossible for your child to get a place. GP surgeries are full to capacity lack of healthcare. Inadequate drainage/sewrage issues. Road network unable to cope with extra traffic. Disastrous consequences to wildlife.

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 721

Derbyniwyd: 05/02/2019

Ymatebydd: Mr Daniel Foreman

Crynodeb o'r Gynrychiolaeth:

8 years living in Bynea and work at Gowerton. Travel to work when first moved here was good with no traffic and only took 10 minute. Now it takes up to half hour to travel from my house to Gowerton and you propose to increase the development. That's a long time to travel for only 4 miles. I see a lot of foxes running around the streets due to the developments pushing them out. With the proposed developments Are you going to upgrade sewer systems, phone lines roads, schools, doctors ect. Can't get an appointment with the doctors now

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 1123

Derbyniwyd: 07/02/2019

Ymatebydd: Miss Lauren Morris

Crynodeb o'r Gynrychiolaeth:

Lack of infrastructure
Distribution for local residents,
Increase in flood risk with near by site 'clos y gerddi' already awarded an amber warning for flooding
Local schools can not support the children already based in the area, no room for more.
Local doctor surgery's cannot support the amount of residents currently living in the local area, its impossible to get an appointment now, let alone with additional residents.
Loss of agriculture.
Consequences to wildlife
Increase in traffic which is currently horrendous in the area, causing more polution - huge current affair which will draw media attention to councils decision.

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 1124

Derbyniwyd: 07/02/2019

Ymatebydd: Mr Lee Watson

Crynodeb o'r Gynrychiolaeth:

The road network will not be able to cope with the extra volume of traffic and with the increase amount of cyclists in the area a fatallity wont be far away
The healthcare centre is already difficult enough to get an appointment with many times unable to get one due to the amount of residents already in the area.
Due to been on a amber flood plane adding new houses will increase the risk of flooding. Disastrous consequences to wildlife in the area and inadequate info stucture lack of school places in the area

Gwrthwynebu

Safleoedd Ymgeisio a Gyflwynwyd / Candidate Site Submissions

ID sylw: 2331

Derbyniwyd: 08/02/2019

Ymatebydd: Mrs Caryl Phillips

Crynodeb o'r Gynrychiolaeth:

The previous and continuing overdevelopment of Bynea has overwhelmed the existing infrastructure such as sewerage, traffic congestion, local education and health services. Development included on the previous LDP are as yet far from complete.

Once complete these will obviously further exacerbate the lack of facilities to cope with the number and type of additional developments proposed on the candidate site list.

Maintenance of open space and the creation of much needed leisure facilities for the area would be most welcome.

Retain as agriculture / open space